DISCLAIMER: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, Infor, or Sage. Any use of the software product names is descriptive of product experience / skillset or used to review the ITSM and CRM products.
I am overqualified. 27+ years ITSM experience and 100+ ITSM implementations in the UK, Europe, Australia, New Zealand, South Korea, Singapore, Canada, and USA. That’s way too much experience. You’re probably used to junior developers or consultants and don’t want to change.
I under promise and over deliver. You probably want a team of junior developers to overpromise, under deliver, and spend all your time in status calls and meetings to get little done.
My rates are far too competitive. You likely want to pay double the price for half the results and love to pay invoice after invoice with little results.
I deliver the latest solutions and best practices. You probably want to stay with the same old cumbersome system and don’t want to improve what you’re doing. Why change anything right?
I’m results oriented. You probably prefer invoice oriented and don’t care about results. You’d rather spend time on status calls, in meetings, and paying invoices with little to show.
Not an Ivanti Consultant, nor Ivanti Developer, nor a member of the Ivanti Professional Services group (which btw is outsourced to Ivanti Business Parnters). I’m independent. Unbiased. Simply Better! I have never been employed by Ivanti, although I have subcontracted for Ivanti Business Partners to provide Ivanti Professional Services due to my extensive experience with products such as but not limited to Ivanti Neurons, Ivanti Service Manager, ServiceNow, Saleslogix, SageCRM, Remedy, HEAT.
DISCLAIMER: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, Infor, or Sage. Any use of the software product names is descriptive of the fact that I have experience with the above-mentioned ITSM and CRM products
Not convinced? My customers can give you more reasons, see what they have to say here.
DISCLAIMER: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, Infor, or Sage. Any use of the software product names is descriptive of product experience/skillset or used to review the ITSM and CRM products.
Spoiler alert. This blog post was created by ChatGPT!
ChatGPT by definition is a large language model trained by OpenAI based on the GPT (Generative Pre-trained Transformer) architecture, designed to understand and generate human-like language, which allows ChatGPT to have conversations with people and answer their questions on a wide range of topics. The purpose of ChatGPT is to assist and provide helpful responses to users.
On the surface it looks very promising, but as you dig deeper you will find there are still quite a few glitches and it’s more of a glorified search engine, not unlike using Google Voice, Alexa, or Siri to search for information.
Before ChatGPT, there was actually another way to produce similar results. That is with keywords, full-text indexing, and some crafty design & development to produce the correct Knowledge Articles and FAQs. Sure the interface is different but the result is the same, and arguably better because you can target specific keywords to specific results.
AI certainly has come a long way, particularly the AI Voice, which if you’re listening to this ITSM blog post as a podcast, you’ll find it’s pretty good. Still a little robot like for my liking and not very good at acronyms but certainly has potential.
Best Practice for designing Request Offerings is to always set a Unique ID for your Request Offering form controls.
Unique ID plays a critical Design & Architecture Role
Unique ID is the Parameter Name which in turn is used for searches, filters, and reporting for Service Requests.
Don’t Do This!
What if you don’t set unique id? You will be in a world of pain when you try to search, filter, or report on Service Request Parameters. In the example above you can see the unique id for the Approving Manager for example is combo_10. That’s not meaningful now is it.
You always want to set a your Unique ID to a meaningful name.
Do That!
But that’s not all… You have many request offerings which have many service request parameters. So you need to use consistent unique id’s across all your request offerings.
Use a Data Dictionary for your Service Request Parameters and use it whenever you’re defining Unique IDs to look up existing Unique IDs and to add new ones.
I have been providing ITSM Best Practices, Latest Solutions, Development, Consulting, Architecture, and Design since 1996, that’s 27+ years, 100+ ITSM implementations, worldwide, in the UK, Europe, Australia, Singapore, Canada, USA with products such as but not limited to Ivanti Neurons, Ivanti Service Manager, Saleslogix CRM, and HEAT ITSM. I also have ServiceNow, Remedy, and Sage CRM experience.
Disclaimer: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, or Infor. Any use of the software product names is descriptive of product experience/skillset with the above-mentioned ITSM and CRM products.
Today I will cover the most common UAT Pitfalls, recommendations, and best practices to put your ITSM Project back on track!
Perspective
First and foremost you want to do a review of where the ITSM Implementation Project is at. The typical implementation milestones such as Scope of Work, Requirements Gathering, Solution Design, Prototype, and Business Requirements Sign-Off and/or Prototype Sign-Off have been met. That alone should give the customer confidence. And if it doesn’t, then now is a good time to re-iterate all the successes and milestones met.
Drawing from and relating to previous implementations at the same customer site also gives perspective, for example, if several UAT Test Teams have completed their UAT Test Scripts within 5 days and one team is struggling and taking weeks on in, then that is worth sharing to the struggling team and having other UAT Teams share their experiences and successes.
Try to use analogies wherever possible to explain and clarify where things are at. I like using the analogy of purchasing a car. The customer has requirements, such as family of 4, active life style, living in a 4 season climate, with a medium size budget. The UAT Test Scripts are the test drive. The family is the UAT Team. The consultant wears hats of the sales person and mechanic. Ultimately the family needs to go for a test drive , mom or dad are the ultimate decision makers and lead (UAT Lead) the family, perhaps with their oldest child (the UAT Lead), and all aspects of the requirements are discussed with the sales person and perhaps the mechanic (consultant). The sales person (Consultant) gives some advice on what route to take (sample UAT Test Scripts), and helpful advice as to how the car handles and what features the car has. Ultimately though the Customer needs to test drive the vehicle. Get in, familiarize yourself with the control, adjust the mirrors, seat, and so on. Not unlike familiarizing yourself with the new ITSM System and/or features. And then you take the vehicle for a spin, on the highway, on a city road, on rough terrain, in a parking lot to practice emergency braking, parallel parking, check the trunk, storage space, and all aspects of the day-to-day use of the vehicle (the UAT Test Scripts) and then comes back to the Salesperson with questions. It is very seldom that after carefully studying the market and available vehicles that the customer will come back saying the car is undriveable. So why is it that some User Acceptance Testing sessions go haywire? Keep Reading!
Not having UAT Test Scripts This by far is the biggest issue that can de-rail ITSM Projects. Validation of Business Requirements is essential, as is a proper UAT Test Plan. UAT Test Scripts are a must have to achieve Implementation Success! Who owns the UAT Test Scripts? The customer. The consultant owns the System Test Scripts and Solution Design. Business Processes, Standard Operating Procedures, Business Requirements, and validation of business requirements (UAT) are owned by the customer. Hence that’s why the consultant does not own the test scripts. Simply put, if you are purchasing a car, you typically have a checklist of requirements that you came up with, not the sales person. You don’t walk unprepared into a car dealership and then sign-off after reading the pamphlet. Do your due diligence!
Not following UAT Test Scripts Having UAT Test Scripts is a step in the right direction, however execution is key. UAT scripts must be followed to ensure you’re validating business requirements, and the UAT Lead must work closely with the UAT Test team to ensure team members understand what is expected and asking them why they aren’t following a proven process? When you walk into the car dealership, you don’t just start up the car and say ok I’ll take it. You go for a test drive.
Not following the UAT Support Structure As with any process or procedure, it is important to understand the support structure. The UAT Team Members must know who to turn to when there are questions or issues. The UAT Lead is responsible for coordinating UAT Test Scripts with the Team and ensuring Team Members know what is expected. In the event of questions, the UAT Lead should channel that question to the correct individual, if the UAT lead is unable to answer. Note that T.ogether E.veryone A.chieves M.ore, so be sure to have regular UAT Team Meetings where the UAT Team Members can review their finding s and ask for support (Product relatedHow-To, Procedural, etc) amongst the TEAM and with the UAT Lead and getting direction from the Decision Maker.
When you purchase a car as a family, then everyone gets a chance to participate in the test-drive, unless of course the kids are toddlers, but even then you need to include them in the test-drive, and strap them into the baby-seat to see if it is up to your requirements. So when family members identify an issue, it goes to the parent. Ultimately it’s the parents that sign off, make and own the decision.
No Collaboration Some UAT Testers tend to work in silos, creating a list of all the problems the find whereas the best practice is to encourage collaboration, as per the above support structure, and emphasize solutions, not problems.
If your team insists of creating a separate list of problems in outdated tools such as Word, Excel, Notepad, or handwritten, then it’s time to re-emphasize the importance of collaboration and discussing the issues at the next UAT Team Meeting rather than letting the frustrating build up.
When the family members decide to raise problems at every turn of the test-drive, then it’s time to have a family meeting and address the concerns. Is it really a problem with the vehicle? Is there something else going on? Is there some confusion around an aspect of the vehicle?
No Internal Meetings One of the best practices for UAT is to ensure you have regular standup UAT meetings, daily at first, until you have momentum and are able to move to weekly. These meetings are essential for collaboration and ensuring everyone is working together to find solutions, not problems. Not unlike family meetings, the parents need to be on the same page and the family deserves to know what’s going on and have some input on the decision and test drive results.
Learning Curve Any new software product or major feature has a learning curve. ITSM products are no different. Moving from Excel to a new ITSM product, even upgrading to a newer version, has a learning curve, as do major functionality enhancements. Without the support structure, collaboration, internal meetings, that that learning curve can be detrimental. It is important that any issues, no matter how big or small or channeled to the UAT Lead and/or Training Lead. If needed, the UAT/Training Lead should make a list of questions for the ITSM Consultant so that areas requiring assistance are addressed. Tip: This is where the a19 UAT Test Scripts Module comes in, by entering Comments for the consultant.
When you’re test-driving a vehicle, there is a leaning curve too, so what do you do, first you do a visual inspection around the car, then inside inspection, check the side mirrors, rear view mirror, familiarize yourself with the control, adjust the seat, and then get familiar with how the car handles. Just like with any new ITSM System or new ITSM features. It’s quite intuitive. Of course unless you’ve never driven a car or never even used a PC or Google. Then the learning curve will be harder and you need some basic training.
Terminology When implementing a new system, there often is new terminology or a change in terminology, be it technical or business related. You’ve made it this far, so any new terminology has without a doubt been covered in the many workshops, design sessions, prototype reviews, and at sign-off.
Any questions about terminology should be logged by the UAT Lead, reviewed with the Decision Maker, and if needed, reviewed with the ITSM Consultant. Often it’s just simple changes in terminology, like gas tank or fuel tank. Trunk or boot of the car. If you haven’t heard one term before well then you don’t raise that as a flag and stop driving the car and say it’s unusable. You just ask for clarification and keep on plugging away. It’s not the end of the world, but if you’re confused then raise your hand and talk to the UAT Lead.
Resistance to Change Change is inevitable. The only constant is change. Yet it’s human instinct to resist change. Change needs to be enforced by the Decision Maker and supported by the UAT Lead. Sometimes the best answer is to re-emphasize “the new way of doing things” and gradually over the time, users will adapt. Like when you purchase an SUV because it fits all the business requirements but many family members really had their heart set on a Sports Car or family members were used to the old gas guzzling family car that had lots of good memories, was no longer economical and the family had outgrown.
Not following or understanding business process/procedure The key to remember is that the Business drives Technology, and not the other way around. Focus needs to be on the business requirements and operating procedures. Be sure to seek guidance from the Decision Maker if any business operating procedures are unclear. When you’re test driving a car, then you test various aspects of your day-to-day use of the car. Highway driving, city driving, off-road, parking, etc. Everyone on the UAT Test Team (participants) should be well acquainted with their role. New drivers will need more help than others.
Not understanding the UAT Test Script Some UAT Testers might find UAT Test Scripts hard to follow. Remember these scripts are built by the decision maker and/or UAT Lead, so be sure to raise any questions and make note of any improvements to the UAT Test Scripts. UAT Test Scripts aren’t written in stone and can be updated as needed. Some UAT Test Scripts need no explanation at all, while others may require explanation of a standard operating procedure, steps to take, and input date. If you take a car for a test drive and milli-vanilli decide to do emergency braking on the highway, well that’s going to shock and confuse everyone. So make sure you are clear on what and why you’re testing.
Not having UAT Test Data While you may get away with using milli-vanilli data (arbitrary data), the best practice is to always use real data and examples from your existing system, whether that system is a sophisticated computer system, excel, or hand written artifacts. You will want to have real life data available that accurately reflects the type of input the tester will be using in day-to-day operations. Simple put, if you’re replacing your Helpdesk Ticket System, use ticket data. If you’re replacing sales order, use sample sales orders. Similar to regression testing, put your old system on the left hand side and the new system on the right hand side and then go through the motions in your old system and replicate in the new system. When you’re test-driving a car, your test data is your current way of doing things, plus some artifacts such as the oversized golf clubs or family bikes or skis that need you need to make sure fit.
Focusing on nice-to-haves versus MUST-HAVES The key intention of UAT is to validate business requirements (must-have-requirements), not to minimize the number of clicks, or nit-pick UI Design. There is always room for UI Improvement (nice-to-have requests) and that time is after UAT is complete and business requirements have been signed off. This tends to be where some UAT Testers get stuck, focusing on the window dressing instead of the architecture and foundation. When you purchase a car, the accessories are just that. Sure the super expensive surround sound is nice, but is it needed? Are the fuzzy dice, bumper stickers, upgraded paint job, and fancy wheel covers really imperative when conducting road test?
Training Material Keep in mind that the UAT Test Scripts are not training guides to the system, but rather steps to validate the business requirements by the owning team. It is up to the owners of the scripts, to maintain the scripts and word the steps in a way that is meaningful to their users.
Software has come a long way and the old ways of creating extensive training materials with step by step instructions and days of classroom training are in the past. Web applications nowadays are intuitive and require very little training. Albeit there is always a learning curve for any new application.
If more detailed training materials are needed, over and above the training videos provided by the ITSM Consultant, and workshop recordings of all ITSM Project Sessions to date, then a best practice is to have the customer’s training lead or knowledge manager to work with the ITSM Admin to clarify and if needed, work with the ITSM consultant to tailor customer specific training videos.
However, that shouldn’t stop UAT testing. As always keep moving forward and test what you can, collaborate with your team, and ask for help from the UAT Lead, who can always get help with ITSM specific functionality question from the ITSM Admin.
More often then not, it’s just a matter of getting used to the new way of doing things, reading between the lines, and trust that the most important interface, the chair to keyboard interface, will figure it out.
It’s not unlike getting used to a new card that you’re test driving, it will handle differently then what you’re used to, the gas tank may be called fuel tank and placed on the opposite side of what you’re used to, but doesn’t stop you from the road test. You continue as needed and trust that you will figure out the changes. Owner manuals are time consuming to read, hardly every read, and just collect dust in the glove compartment. A few questions, some help from others, from the experienced drivers, and voila you are mastering the road test in no time.
Waiting until the final hour to ask for help Some implementations tend to go very smooth while others tend to stagnate with the UAT Team either not testing, focusing on nice-to-haves versus validating must-have requirements, and any combination of the above pitfalls, and then ultimately raising a red flag out of the blue with a long list of issues, that could have been easily addressed as per the above recommendations and best practices.
You don’t wait until the day of the paper signing to mention that rattling noise or performance issue during the test-drive, you mention it right here and then. But it can happen, and if it does, then you go for another test drive and move forward!
Gaps Although technically not a pitfall the UAT Team might stop testing all together or raise flags when gaps are identified. Ironically Gap Analysis is the intention of UAT, to validate the Business Requirements and identify any show stoppers (gaps). When a gap is identified, it should be raised to the UAT Lead to verify, and if confirmed, reviewed with the decision maker, to prioritize. Showstopper versus implement-later versus nice-to-have. For example, that ski-rack that you need, and isn’t available. Is that a show stopper? If it’s the middle of summer and you can wait until December? Not having 4 wheel drive for country roads in winter conditions for a work truck could be a major gap. And you know what we do with gaps right, we address them, and fill them. Such as ask for the 4 wheel drive model. However make sure you adequately prioritize gaps and just focus on needs, not wants.
In summary, the best practice for your ITSM system is to ensure that UAT Support Structure is followed, UAT Test Scripts are actively used and maintained, real test data is used from your existing system, and the team looks for solutions, not problems collaborates regularly, and focuses on must-have versus nice to haves, and moving forward with the new way of doing things, realizing there is a learning curve, and the decision makers have signed-off after many workshops, prototypes, and discussions to move ahead and need you to validate that the day-to-day requirements have been met.
It’s not unlike test-driving a new car you want to purchase. You take it for a spin and take it through the motions of your day-to-day activities. Parking, driving on the highway, check the storage space, handling, ask your significant others opinion, collaborate on your findings, and then focus on must-haves. The nice-to-haves like the fuzzy dice on the rear-view mirror aren’t important. Those you can get to later, after you did some emergency braking, speed tests, and the likes and find the new car is up to snuff. Sure, you need to get used to how it drives, there is a learning curve to any new car. And if the ski rack you want isn’t available now, in mid-summer, well no biggie, not the end of the world. Also rest assured that the decision makers have done their research, kicked the tires, and had many discussions with the dealership to make sure it’s the right fit. And of course the dealership is committed to address any reasonable concerns or issues.
DISCLAIMER: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, Infor, or Sage. Any use of the software product names is descriptive of product experience/skillset or used to review the ITSM and CRM products.
This is exciting news! Looking forward to reconnect with former Bendata/Frontrage HEAT Consultants that went to the dark side and joined Cherwell! IMHO the acquisition will make Ivanti Neurons (formerly Ivanti Service Manger powered by HEAT) stronger than ever!
DISCLAIMER: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, Infor, or Sage. Any use of the software product names is descriptive of product experience/skillset or used to review the ITSM and CRM products.
Over the last 2+ decades implementing HEAT IT Service Management and Ivanti Service & Asset Manager, the following implementation milestones, aka rollout milestones, or roadmap have been deeply ingrained and proven to be the ultimate success factor and project structure.
From Scope of Work to Go-Live (Rollout) there are many steps that need to be carefully planned, communicated, and enforced.
There is more to ITSM Consulting Projects than software & systems. You need to take a holistic approach and carefully plan your implementation, upgrades, and enhancements. It starts without the software, and requires strategy over tactics. It all starts with goals. S.M.A.R.T. Goals.
SMART is an acronym for Specific, Measurable, Attainable, Realistic, and Time–bound
Goals should be as specific as possible, even if this means breaking them down, by including answers to the popular “W” questions: Who, What, When, Where, Which, Why
If a goal is not measurable, it is not possible to know whether a team is making progress toward successful completion. If it’s an ITSM Project that’s going to take a few months to complete, then set some milestones by considering specific tasks to accomplish.
A goal needs to be achievable, but at the same time it must not be too easy.
A goal that supports or is in alignment with other goals would be considered a relevant goal, focusing on something that makes sense with the broader business goal or ITSM Project.
A time-bound goal is intended to establish a sense of urgency. After all a goal that lacks realistic timing, changes are you’re not going to succeed with your ITSM Project.
Who: UAT Test Lead, designated UAT Team, and Subject Matter Experts (SMEs) as outlined by Roles & Responsibilities Matrix
What: Create day to day use case scenarios for job functions for the Procurement process
When: Over the next two weeks with a Target Date of September 19
Where: Go-To Meeting and the Breakout Meeting Room
Which: Standard Business Operating Procedures with guidance from SMEs and Decision Maker
Why: We need to validate the the business processes and requirements.
Measurable: Milestones, at least three internal meetings, and breakout sessions for the SMEs for the below categories, with at least 6 test cases that are aligned to the Standard Operating Procedures; Regression Testing, Asset Scanning, Procurement.
Achievable: Focus on day-to-day job functions as outlined by the SOPs and seek guidance from SMEs and the decision maker as needed.
Relevant: Day to day job functions only as per the SOPs. Do not use the software, this would be system testing, focus is on job functions and satisfying day to day operational tasks.
Time-bound: Target Date September 19, with first meeting on September 10, follow up meeting on September 15, and review September 17th.
With ITSM Implementation experience going back to 1996, the ITSM Best Practice System is a result of years of experience, knowledge, and proven methods.
ITSM and CRM Experience
Extensive Implementation Experience with ITSM and CRM products including but not limited to Ivanti Neurons, Ivanti Service Manager, Saleslogix CRM, and HEAT ITSM. As well as ServiceNow, Remedy, SageCRM.
Disclaimer: Not endorsed by, affiliated with, or sponsored by Ivanti, ServiceNow, Remedy, Infor, or Sage. Any use of the software product names describes the fact that we have experience with the mentioned ITSM and CRM products.
100+ ITSM and CRM Implementations since 1996. That’s over 27 years of hands-on consulting, development, integration, and project management experience.
Professional Services
a19 Consulting has been providingProfessional Services for Fortune 500 & Global 500 Enterprise Clients, Frontrange Business Partners, Ivanti Business Partners, and private Swiss banks, worldwide in the UK, Europe, Australia, New Zealand, South Korea, Singapore, Canada, and the USA.
Disclaimer: We have never been directly employed by Ivanti, although we have been sub-contracted by Frontrange Business Partners and sub-contracted by Ivanti Business Partners to work with Ivanti Project Managers for many Frontrange and Ivanti Projects over the last 27+ years.
Service Area
Implementations around the world have benefited from our ITSM Best Practice System
The ITxM Space (ITSM, IT Service Management, ITAM, IT Asset Management) has never been more exciting, as is the transformation to ESM (Enterprise Service Management).
Lets take your ITxM Implementation to the next level, with the latest solutions, best practices, workflow automation, integrations, and so much more!
Best Practices for almost every sector, including, but not limited to Government, Financial, Insurance, Communications, Information Technology, Energy, Utilities, Education, Retail, Manufacturing, Pharmaceutical, Medical, Aerospace, Entertainment, Food, Health Care, Transportation, Engineering.
Are you getting the most out of your ITSM Implementation?
You aren’t. Until you talk to me. Guaranteed!
Give me just 19 minutes of your time and I GUARANTEE to improve your ITSM Implementation
Gregor Anton | a19 Consulting | ITSM/ITAM/ESM/CRM | Best Practice Systems
The most important decision you need to make to take your ITSM Implementationto the next level is contacting us. Before it’s too late. Our resources book up weeks and sometimes months ahead of time, for good reason. Join other Customers and contact us,we are here to help.
Testimonials
for Freelance ITSM Projects carried out for the Ivanti ITSM toolsets.
Night and Day Compared to Ivanti and other HEAT Consultants & Developers
Ivanti HEAT ITSM To The Next Level
Five Stars All The Way
Very knowledgeable and the years of experience with Ivanti ITSM products are apparent in how thorough the consultation has been!
Best in Class
Unique and Distinctive Ivanti HEAT ITSM Authority
Everyone else said it could not be done!
ITSM Discovery Session
The purpose of the discovery session is to set the wheels in motion, get to know one another, and determine the who, where, what, when, and why of your ITSM Project needs with the goal of establishing a roadmap to help you achieve maximum results and ROI by streamlining your business processes and fine-tuning your ITSM system.
Attendees should be the project owner/decision maker.
Topics covered range from Incident Management, Change Management (Change Control), Problem Management, CMDB, Hardware Asset Management, Asset Bar Code Scanning, Software Asset Management, Software Inventory and Entitlements, Procurement, Service Requests, Request Offerings, Customer Self-Service Customer Support Portals, Email Summaries, Reports, SLAs, OLAs, Dashboards, Analytic Metrics, Workflows, Training strategy.